× Webinar: Learn how the Arizona DOT used Site Scan to cut the time and cost of redesigning the Pinto Creek Bridge. Click to read more

Unfolding Legs

Remove the bolts and nuts to the inside of the folded legs (1),
unfold the legs, re-insert the bolts, and secure with the nuts (2).

x8_assembly_two

Email

Email our team for support